Early clarity. Better project outcomes.
Every project has its own scope, approvals, consultants, schedule, and existing conditions. VSN uses a five-step process—Listen, Plan, Design, Deliver, and Support—to organize the work and explain what information is needed at each stage.
The framework is not a promise that every project follows the same sequence or includes every service. The written agreement identifies the applicable phases, deliverables, consultant roles, assumptions, and exclusions.
Contact usStep 01
Goals, property, documents, and the decision to support.
Step 02
Feasibility, zoning, code, and the approval path.
Step 03
Planning, design, and coordinated documents.
Step 04
Permits, bidding, and constructability.
Step 05
Construction administration and closeout.
Step 01
The process begins by understanding the client’s goals, concerns, property, intended use, decision deadline, available documents, budget considerations, and operational needs.
Client goals and the decision to be supported, property address and jurisdiction, existing and proposed use, available drawings, surveys, records, photos, and reports, and known violations, permits, deadlines, or agency requirements.
Introductory call, records request, document review, site visit, or preliminary meeting to define the question before recommending a service.
A summary of the request, a list of information still needed, and a recommended scope or proposal.
Whether to proceed with a focused review, a feasibility assignment, or a defined architectural scope.
Step 02
VSN reviews the information that may affect feasibility and project direction before design or construction commitments advance.
Zoning and bulk requirements, building code, life safety, accessibility, egress, permit history, existing conditions, and consultant and agency requirements.
Feasibility and zoning analysis, code review, existing-condition review, consultant identification, and filing strategy.
A feasibility memorandum, issue list, preliminary program, consultant plan, filing strategy, scope recommendation, or proposal for the next phase.
Whether the project is feasible as proposed, which scope to pursue, and which consultants and approvals are required.
Step 03
When design services are required, VSN develops the project from planning and concept decisions into coordinated architectural documents.
The approved program and scope, survey and existing-condition information, consultant input, owner and tenant requirements, and budget direction.
Programming, space planning, schematic design, design development, construction documents, specifications, 3D studies, and coordination with survey, MEP, structural, special-inspection, and specialty consultants.
Design studies, presentation packages, coordinated drawings, and specifications for review, pricing, and filing.
Design approval, pricing direction, and readiness to file and bid.
Step 04
VSN organizes the architectural information required for the applicable approval and delivery path.
Filing requirements, agency comments, consultant submissions, special-inspection requirements, and bid information.
Permit strategy and expediting coordination, responses to agency comments, bid support, contractor-selection assistance, value engineering, and constructability review.
Filing documents, comment responses, bid sets and clarifications, and value-engineering or constructability notes.
Contractor selection and the start of construction. Approval timing depends on the agency, filing type, consultant submissions, and completeness of the information.
Step 05
Construction-phase services maintain a documented connection between the approved project information and the work being performed.
Contractor questions, submittals, field conditions, change requests, and inspection requirements.
Responses to questions, submittal review, field observations, document clarification, issue coordination, change review, and closeout support.
RFI responses, submittal reviews, field observation reports, and closeout documentation, as defined in the agreement.
Permit sign-off, final inspections, and project closeout.
Direct principal involvement to support informed decision-making
Requests for the information needed to evaluate the issue
Clear identification of assumptions and open questions
Coordination of the consultant team included in the scope
Written deliverables or documentation appropriate to the assignment
Discussion of the next step rather than an automatic commitment to every project phase
FAQs
Find answers to common questions about how a project moves from first conversation to closeout.
Call 718.447.7878 or email info@vsnarchitecture.com.
VSN first reviews the client’s question, property, project goals, available documents, timing, and known concerns. The next step may be a document review, site visit, feasibility assignment, consultation, or proposal.
No. Some assignments involve one focused review, while others continue through design, permitting, construction, and closeout. The agreement defines the applicable services.
Structural and MEP engineers are brought in when their information is needed to evaluate feasibility, develop the design, prepare filings, perform required inspections, or support construction. VSN helps identify and coordinate the relevant disciplines.
Permit preparation generally follows definition of the scope and development of the required documents. The exact sequence depends on jurisdiction, project type, agency reviews, consultant submissions, and filing strategy.
Yes. Construction administration, field observations, issue review, and closeout may be included based on the project and written scope. See permitting and delivery support.