Early clarity. Better project outcomes.

How VSN Architecture Supports a Project

Every project has its own scope, approvals, consultants, schedule, and existing conditions. VSN uses a five-step process—Listen, Plan, Design, Deliver, and Support—to organize the work and explain what information is needed at each stage.

The framework is not a promise that every project follows the same sequence or includes every service. The written agreement identifies the applicable phases, deliverables, consultant roles, assumptions, and exclusions.

Contact us
Architects meeting with a client around a model and drawings

Step 01

Listen

The process begins by understanding the client’s goals, concerns, property, intended use, decision deadline, available documents, budget considerations, and operational needs.

Information collected

Client goals and the decision to be supported, property address and jurisdiction, existing and proposed use, available drawings, surveys, records, photos, and reports, and known violations, permits, deadlines, or agency requirements.

Work performed

Introductory call, records request, document review, site visit, or preliminary meeting to define the question before recommending a service.

Possible deliverables

A summary of the request, a list of information still needed, and a recommended scope or proposal.

Next decision

Whether to proceed with a focused review, a feasibility assignment, or a defined architectural scope.

Hand-drawn site plan on a drafting table

Step 02

Plan

VSN reviews the information that may affect feasibility and project direction before design or construction commitments advance.

Information collected

Zoning and bulk requirements, building code, life safety, accessibility, egress, permit history, existing conditions, and consultant and agency requirements.

Work performed

Feasibility and zoning analysis, code review, existing-condition review, consultant identification, and filing strategy.

Possible deliverables

A feasibility memorandum, issue list, preliminary program, consultant plan, filing strategy, scope recommendation, or proposal for the next phase.

Next decision

Whether the project is feasible as proposed, which scope to pursue, and which consultants and approvals are required.

Architect sketching plan revisions at a drafting table

Step 03

Design

When design services are required, VSN develops the project from planning and concept decisions into coordinated architectural documents.

Information collected

The approved program and scope, survey and existing-condition information, consultant input, owner and tenant requirements, and budget direction.

Work performed

Programming, space planning, schematic design, design development, construction documents, specifications, 3D studies, and coordination with survey, MEP, structural, special-inspection, and specialty consultants.

Possible deliverables

Design studies, presentation packages, coordinated drawings, and specifications for review, pricing, and filing.

Next decision

Design approval, pricing direction, and readiness to file and bid.

Architect reviewing an existing building during renovation

Step 04

Deliver

VSN organizes the architectural information required for the applicable approval and delivery path.

Information collected

Filing requirements, agency comments, consultant submissions, special-inspection requirements, and bid information.

Work performed

Permit strategy and expediting coordination, responses to agency comments, bid support, contractor-selection assistance, value engineering, and constructability review.

Possible deliverables

Filing documents, comment responses, bid sets and clarifications, and value-engineering or constructability notes.

Next decision

Contractor selection and the start of construction. Approval timing depends on the agency, filing type, consultant submissions, and completeness of the information.

Construction professional in a hard hat reviewing project information on a tablet in the field

Step 05

Support

Construction-phase services maintain a documented connection between the approved project information and the work being performed.

Information collected

Contractor questions, submittals, field conditions, change requests, and inspection requirements.

Work performed

Responses to questions, submittal review, field observations, document clarification, issue coordination, change review, and closeout support.

Possible deliverables

RFI responses, submittal reviews, field observation reports, and closeout documentation, as defined in the agreement.

Next decision

Permit sign-off, final inspections, and project closeout.

What the client can expect

Expert Leadership

Direct principal involvement to support informed decision-making

Information Gathering

Requests for the information needed to evaluate the issue

Clarity & Transparency

Clear identification of assumptions and open questions

Team Coordination

Coordination of the consultant team included in the scope

Clear Documentation

Written deliverables or documentation appropriate to the assignment

Strategic Next Steps

Discussion of the next step rather than an automatic commitment to every project phase

FAQs

Frequently asked questions

Find answers to common questions about how a project moves from first conversation to closeout.

Still have questions?

Call 718.447.7878 or email info@vsnarchitecture.com.

Contact VSN Architecture

What is the first step when starting an architectural project?

VSN first reviews the client’s question, property, project goals, available documents, timing, and known concerns. The next step may be a document review, site visit, feasibility assignment, consultation, or proposal.

Does every project require all five phases?

No. Some assignments involve one focused review, while others continue through design, permitting, construction, and closeout. The agreement defines the applicable services.

When are structural and MEP engineers involved?

Structural and MEP engineers are brought in when their information is needed to evaluate feasibility, develop the design, prepare filings, perform required inspections, or support construction. VSN helps identify and coordinate the relevant disciplines.

When are permits submitted during the architectural process?

Permit preparation generally follows definition of the scope and development of the required documents. The exact sequence depends on jurisdiction, project type, agency reviews, consultant submissions, and filing strategy.

Can VSN remain involved during construction?

Yes. Construction administration, field observations, issue review, and closeout may be included based on the project and written scope. See permitting and delivery support.